Astrolift Logo
0Cart

Heat Tunnel (Adjustable Height)

Double Chamber Shrink Tunnel

Buy Heat Tunnel (Adjustable Height) in Heat Tunnels from Smipack available at Astrolift NZ
  • Suitable for Medium to High Production Volumes
  • High Output, Low Power Consumption
  • 1 Year Warranty
We don’t just supply the equipment – we can also arrange professional installation to make sure everything is set up correctly and ready to use. Talk to us today.
Large Heat Tunnel Machine
Heat Tunnel
Heat Tunnel Conveyor
Heat Tunnel
Heat Tunnel Conveyor
Large Shrink Heat Tunnel Heat Shrink Tunnel
Model Number

PWT-SMI-007

PWT-SMI-008

Conveyor Speed (m/min)

5.6 - 37.6

2.8 - 18.8

Boxes Per Hour (#)

7200

7200

Power Supply

Three Phase

Three Phase

Overall Length (mm)

2160

2160

Overall Width (mm)

940

1150

Overall Height (mm)

1405 - 1565

1505 - 1635

Weight (kg)

390

470

Box Height (mm)

240

310

 

Enquire For Price

Add to Quote

Enquire For Price

Add to Quote
Stock Availability
Out of Stock
Out of Stock
Specification PDF

PWT-SMI-007

Out of Stock

$0.00

Conveyor Speed (m/min) 5.6 - 37.6
Boxes Per Hour (#) 7200
Power Supply Three Phase
Overall Length (mm) 2160
Overall Width (mm) 940
Overall Height (mm) 1405 - 1565
Weight (kg) 390
Box Height (mm) 240
PWT-SMI-007

Enquire For Price

Add to Quote

PWT-SMI-008

Out of Stock

$0.00

Conveyor Speed (m/min) 2.8 - 18.8
Boxes Per Hour (#) 7200
Power Supply Three Phase
Overall Length (mm) 2160
Overall Width (mm) 1150
Overall Height (mm) 1505 - 1635
Weight (kg) 470
Box Height (mm) 310
PWT-SMI-008

Enquire For Price

Add to Quote

Double chamber shrink tunnel for pairing with L-bar sealers to achieve a medium to high production shrink wrap for inline product flows.

Features & Benefits

  • Powder-coated
  • Control system with LCD control panel
  • Precise control of tunnel conveyor speed
  • Precise control of tunnel temperature for shrinking operations
  • Scheduling of up to 10 work cycles
  • Conveyor can have turning or fixed silicon rollers
  • In built cooling system
  • Tunnel airflow adjustment using flaps
  • Can use PVC film, polyolefin and polethylene up to 50my
  • Low power consumption

Related Resources

REQUEST A CALLBACK